Key Projects For Foreign Investment In Guangxi China (2005)  
 Item No. Names of Project & Sponsor Construction Scale & Content Construction Site Construction Conditions Total Invmt ($10000) Mode   Estimated Benefits Preparations finished Connector &Connected Telephone
G. Municipal Infrastructure Construction
195 G1 Xijiang No. Three Bridge Construction Project in Wuzhou (Wuzhou Infrastructure Investment Management Co. Ltd.)  Construction of one bridge of continuous steel structure  reinforced concrete hollow plate with a total span of 4890 meters, of which river crossing bridge section is 680 meters long, the main bridge is 980m,the flyover is 380 m, the width of the bridge surface is 26 m and the width of the standard road surface is 44.5 m.   Wuzhou city Supporting facilities such as road access, water and power supply and communications are readily available with ample supply of various building materials.  965 Joint-venture or sole-venture internal rate of income: 10.33%, invtmt recovery period: 12.76 years. ①Project proposal;             ②Feasibility study Wenxiao            Tel: 86-774-5826878            Fax: 86-774-5833108
196 G2 Guangxi General Aviation Project  (Guangxi Economic Cooperation Office) To purchase     planes of various types , to construct one heliport  and one  building complex. After completion, the project is used to serve the general aviation market within Guangxi.   Nanning city Nanning is the political, economic and cultural center of Guangxi and is adjacent to the ASEAN, located in the center of China-ASEAN Free Trade Area. Therefore it has its special geographical advantages. This project will fill up the vacancy in the general aviation business in Guangxi.  1200 Joint-venture , cooperation or sole-venture internal rate of income: 15.8% ①Project proposal;             ②Feasibility study Huangshaowen   Tel: 86-771-5855919            13367810893 Luochangsan     Tel: 86-771-5851068 
197 G3 Construction of East Jinhaiwan Street (including Qinzhou No.Three Bridge) and West Jinhaiwan Street in Qinzhou  (Qinzhou Hengyuan Traffic Investment Co. Ltd.) Total length is 6.82 km designed as the Grade I artery road of the city. The road width is 80 m and the project is to be constructed in two phases.The designed road speed for Phase I project is 60    km/h with the width of the roadbed as 30 m and the width of the concrete road surface is 2×12 m with road median zone as 2m in width.The total length of West Jinhaiwan Street is 6.33 km. The width of the existing roadbed is 24.5 m, the width of the concrete road surface is 9 m. The project scope includes the enlargement of concrete road surface to 22 m and enlargement of bridge width to 25.5 m. Qinzhou city This road project is located in the landform of a little hilly plain with simple geographical and hydrologic regime, with marine climate of the south of subtropical  zone. There is an ample supply of road building materials  with convenient facilities for water and power supply and access roads.  2395 Transfer of the Right of  Collection of Toll Charge or cooperation internal rate of income: 8.92%, invtmt recovery period: 15 years. Project proposal;             Feasibility study;                 Approval for registration        Liangxianhua     Tel: 86-777-2857109            Fax: 86-777-2857102
198 G4 Arterial Ring Road   in the City Zone and Xijiang No. 2 Bridge (Pingnan Investment Promotion Bureau) The total length of the Arterial Ring Road in the City Zone is 22 km and the width of the roadbed is 25.5 m. The length of the Xijiang No. 2 Bridge proper is 874 m  and the length of the bridge approach is 1329 m , the width of bridge is 23 m.  Pingnan county, Guigang city The bridge is located on a site with flat landform , easy access, quick communications and convenient  power supply. The construction materials necessary for the project can be purchased locally.   6490 Joint-venture , cooperation or BOT Annual income: 12.63 million USD, annual profit: 10.38 million USD. Approval has been obtained for project initiation and  charge collection initiation.  Liyezhou            Tel: 86-775-7820300
199 G5 Expansion of Sewage Treatment Plant of East District of Guilin (Guilin Water Drainage Works Management Section) To perform expansion on one sewage treatment plant with a treatment capacity of  8-10t/day. Guilin city There is in existence one sewage treatment plant---Qilidian Sewage Treatment Plant . 2053 Joint-venture , cooperation or BOT Collection of sewage treatment fees Project proposal;             Feasibility study;                     Liaojiaqi            Tel: 86-773-3843224             13907835666
200 G6 Flood Prevention and Control Project (Phase II) for Pingnan County Seat (Pingnan Investment Promotion Bureau) It is planned to build a flood prevention dam  with a total length of 3 km  for a width of 6 m in association with buildings with a standard for a flood in 50years' concurrency. The project scope includes the demolition of houses along the banks, removal of danger in the flood prevention dams  and  reinforcement of the dams, construction of commercial shop fronts and related supporting facilities, etc.   Pingnan county, Guigang city The geographical conditions are good in the project area with smooth shorelines and  easy access, convenient water and power supply facilities, speedy communications and ample supply of construction materials as well as  favorable terms of cooperation. 1147 Joint-venture , cooperation or others profit margin: 15.5%, invtmt recovery period: 8.5 years. Project proposal;             Feasibility study;                 Approval for registration        Liyezhou            Tel: 86-775-7820300
201 G7 Expansion of Water Supply System in the County Seat of Shangsi County and Rebuilding of the Water Distribution System  (Shangsi Water Utilities) To newly start the water source project, water purification project, and the new water supply distribution system with the diameter of over DN200, totaling 25 km with a daily supply capacity of 25000 cubic meters.   Shangsi county, Fangchenggang city With a small amount of works, it is easy to carry out the construction.  390 Joint-venture The estimated sales volume for the first year after the completion of the project will reach 438     cubic meters.   Project proposal;             Feasibility study;                 Approval for registration        Shangsi Water Utilities             Tel: 86-770-8513252
202 G8 Expansion of Water Supply System in the County Seat of Lingshan County, Guangxi (Lingshan Water Supply Bureau, Guangxi) To add a new production line with a capacity of 50000t/day and to construct some production facilities and water supply distribution systems.  Lingshan county, Qinzhou city With complete supporting facilities such as road access, communications, water and power supply, etc. together with ample supply of various construction materials.  820 Joint-venture , cooperation or BOT internal rate of income: 10.55%, invtmt recovery period: 11.3years. Project proposal;             Feasibility study;                 Approval for registration        Qindaguang        Mochunbo         Tel: 86-777-6516298            6528666
203 G9 Expansion of Water Supply System in the County Seat of Pubei County (Pubei General Water Supply Company ) To add a supply capacity of 25000t/day to the system and supply of water pipes (DN200-DN700) for a total length of 22050 m.) Pubei county, Qinzhou city The site of the water purifying works and the area through which the water distribution pipes run are located in the terrace area of small river valley with good soil texture. The power supply for the county seat is supplied from Beihe 110KVA Substation and Xitang 35KVA Substation.     411 Joint-venture , cooperation or BOT internal rate of income: 9.87%, invtmt recovery period: 10years. Project proposal;             Feasibility study;                 Approval for registration        Gaozhenghui      Tel: 86-777-8310189            Fax: 86-777-8310189
204 G10 Sewage Treatment Plant of Qinzhou Port (Guangxi Qinzhou Coastal Industrial Investment Co., Ltd.) To construct a sewage treatment plant with a daily treatment capacity of  50000 tons of sewage together with the sewage drainage piping systems.  Qinzhou Port Economic Development Zone, Qinzhou, Guangxi  Qinzhou Port District has initially taken shape through development. The basic facilities are complete. Water and power supply facilities and communications facilities are available, capable of meeting the needs of the project construction.    1330 Joint-venture , cooperation or BOT internal rate of income: 11.5%, invtmt recovery period: 10.2years. Project proposal;             Feasibility study;                 Approval for registration        Shenshaohong    Tel: 86-777-3889323            Fax: 86-777-3888984              E-mail: qzzsj@ 163.com
205 G11 Water Supply  for Nanning High-tech Industrial Development Zone (Nanning Zeyong Water Supply Co., Ltd. ) The designed water supply capacity is 20000t/d. The project scope includes renovation on the water works and construction of water distribution systems.  Nanning city Expansion project: the water is expected to be taken from Tianpao Reservoir. The project is intended  for the supply of water to the development zone.  254 Joint-venture or cooperation  Annual income: 731thousand USD, invtmt rcovery period: 10years Project proposal;             Feasibility study;                   Zhangzhiguo      Tel: 86-771-3931578            13977135326
206 G12 Water Supply Project for Supply of Water from Qingshitan Reservoir to the City Zone of Guilin (Guilin Water  Bureau ) Project Scale: 630000t/d  in 2010, 840000t/d in 2020. Project scope:abstraction works  from Xiaorongjiang River, pipe works and tunnel for water supply to Guilin.   Lingchun county, Guilin city According to the development requirements of the tenth "five-year plan"  and the master plan of Guilin, the municipal government of Guilin decided at the 50th executive meeting to carry out the project of "Taking Water into the City from Qingshitan Reservoir" .  5676 cooperation annual benefit of water supply: 4.4 million USD,total multi-year mean benefit of flood control: 4.25 million USD,benefit of power generation: 262 thousand USD, and the water compensation benefit: 2.25 million USD.  Project proposal;             Feasibility study;                 Approval for registration        Yangzhiyi          Tel: 86-773-3842664
207 G13 Water Supply Project of Changtanhe Reservoir in Lipu County  (to be specified ) The designed water supply capacity is 30000t/d. The project scope includes the construction of one water treatment system for potable water, together with management facilities, residential buildings, power supply for the plant area, access road into the  plant and the water main  for 19.3 km.   Lipu county, Guilin city This is a new construction  project intended for the upgrading of the  capacity  for water supply to the county seat and towns and villages along the routing. The source water is taken from Changtanhe Reservoir through the gravity flow treatment system. 263 Joint-venture or share-holding internal rate of income: 16.32%, invtmt recovery period: 5.84years. Project proposal;             Feasibility study;                   Mr. Fang           Tel: 86-773-7218352
208 G14 Water Supply Project in Tongyouping Industrial Park in Mengshan County  The designed supply capacity is 60000t/d. The project scope includes the construction of a storage dam and laying of water supply pipes.  Mengshan county, Wuzhou county This is a new construction project. The source water is taken from the reservoir by gravity flow. The project is intended for the supply of water to the industrial park.  160 Joint-venture , cooperation or share-holding internal rate of income: 6.25%, invtmt recovery period: 6.2years. Project proposal;             Feasibility study;                 Approval for registration        Liutianli            Tel: 86-774-6285889            13977466984
209 G15 Water Supply Project for Tieshangang Industrial Park in Beihai  (Beihai Hepu Reservoir Project Management Bureau) The designed supply capacity is 100000t/d. The project scope includes the construction of control sluice gate, water tower, conduit pipes and step-up pumping station, etc.   Beihai city This is a new construction project. The source water is to be taken from Hepu Reservoir through gravity flow. Presently there are 5 enterprises in the park with a total water demand of 51500t/d. 1039 Joint-venture or cooperation   internal rate of income: 13.31%, invtmt recovery period: 13.2years. Project proposal;             Feasibility study;                 Approval for registration        Wulujin             Pengshiqun          Tel: 86-779-5400349          2063392
210 G16 Water Supply Project for Beihai Pulp and Paper Works (Beihai Water Conservancy Bureau, Hepu Reservoir Project Management Bureau, Honghujiang Reserviour Project Management Bureau) The project scale for Phase I is planned to have a supply capacity of 166000t/d and for Phase II,    280000t/d. Phase I project includes the construction of 1 step-up pumping stations, the laying of 2     concrete pre-stressed  water supply pipes of DN 1.2 m  with the length of each as 35.18 km  together with other management facilities. The same amount of water supply pipes will be added for Phase II project.           Beihai city The project site has easy access with developed road networks. Guilin-Beihai  Expressway , Nanning-Beihai Secondary Road and Qinzhou - Beihai Railway pass by the project site and the county seat of Hepu County and Xichang Town are connected by village highway. Water and power supply is convenient and sands and aggregates necessary for the construction are available in the local market.  2492 Joint-venture or cooperation   internal rate of income: 14.6%, invtmt recovery period: 7.3years. Project proposal;             Feasibility study;                   Wulujin             Pengshiqun          Tel: 86-779-5400349          2063392
211 G17 Water Source Project for Water Supply to Qinzhou Coastal Industrial Park(Qinzhou Bay Water Supply Co., Ltd.) Phase I Project is intended for the heightening of Jinwo Reservoir to increase its capacity so as to enable it to fully play the role of water regulation of the reservoir.After being jointly used with such water source projects of Dafengjiang Water Diversion Project as Dongchang Sluice Gate, pumping station and water supply project, etc., the daily supply capacity will reach 550000 tons. For Phase II project, water will be supplied from Yujiang River. Used together with the recent projects, the daily supply capacity will reach 1.2 million cubic meters.    Qinzhou city The sites are separately located 20 km away from Qinzhou and 40km away from the county seat of Lingshan County. Ample water supply is available  and a 10 kv power line is also available on the construction site. The projects are only 10 km away from the production areas of sand and aggregates  with blacktop roads as transportation access.  8499 Joint-venture , cooperation or share-holding The daily consumption volume by the users already in the park will reach more than 180000 tons by  the end of 2005 and 560000 tons  by 2008. The internal rate of income is 15.13 % and invtmt recovery period: 11.3 years. Project proposal;             Feasibility study;                   Lv Quan           Tel: 86-777-2857384
212 G18 Water Supply System for Qisha Industrial Park in Fangchenggang City (Xiaofeng Reservoir Management Section of Fangchenggang City) The near-term supply capacity for the north line project is 38000t/d, and the long-range capacity is 150000t/d.The near-term supply capacity for the south line project is 220000t/d, and the long-range capacity is 450000t/d. Fangchenggang city   725 Joint-venture , cooperation or share-holding invtmt recovery period:12 years. Project proposal;             Feasibility study;                   Linyeshan         Tel: 86-770-3274537          13977096799
213 G19 Water Supply Project for Guixi Alumina Base in Debao County (Guilu Water Supply Co., Ltd.) The designed supply capacity of the project is 110000t/d. The project scope includes civil works construction and the piping system construction.   Debao county, Baise city This is a new project that takes the  water   from the river as the source of supply by pumping. The project is intended for the supply of water for the Alumina  Base . 930 cooperation The water price will be verified by the price management department.  Project proposal;             Feasibility study;                   Cenzubing        Tel: 86-776-2836002
214 G20 Water Supply Project for Hezhou Xiwan Industrial Park (Hezhou Fuquan Water Supply Co., Ltd.) Designed supply capacity: 15000t/d, with a total length of 30km for piping system.  Hezhou city The project is intended for the supply of water to the industrial park . There are 70 enterprises in the park at present and the water consumption by the existing enterprises is 8000t/d.  218 Share participation or share-holding annual income of watersupply: $604 thousand, invtmt recovery period: 7 years Project proposal;             Feasibility study;                 Approval for registration        Maohaiguang    Tel: 86-774-5123582
215 G21 Water Supply Project for Chongzuo Jiangzhou Industrial Park(Chongzuo Water Works ) The designed supply capacity is 50000t/d. The project includes the construction of the plant area and piping system, etc.  Chongzuo city This is a new project that takes water from the river as its supply source by pumping. The project is intended for the water supply system for the industrial park.  604 Joint-venture , cooperation or share-holding invtmt recovery period:15 years Project proposal;             Feasibility study;                   Pankai              Tel: 86-771-7837895           13507872861
216 G22 Water Supply Project for Hezhou Chengdong Industrial Park(Hezhou Fuquan Water Supply Co., Ltd.)  Designed supply capacity: 10000t/d, with a total length of 29km for piping system.  Hezhou city This is an expansion project to be connected to the existing network of the water works. It serves as the water supply system of the industrial park. The designed number of enterprises in the park is 30     . At present there are 12 enterprises in the park with a consumption volume of 4000t/d. 217 Share participation or share-holding annual income of watersupply: $386 thousand, invtmt recovery period: 8 years Project proposal;             Feasibility study;                 Approval for registration        Maohaiguang    Tel: 86-774-5123582