| Key Projects For Foreign Investment In Guangxi China (2005) | ||||||||||
| Item No. | Names of Project & Sponsor | Construction Scale & Content | Construction Site | Construction Conditions | Total Invmt ($10000) | Mode | Estimated Benefits | Preparations finished | Connector &Connected Telephone | |
| H. Tourist and Leisure Travel Resorts | ||||||||||
| 217 | H1 | Leisure, Sanitarium and Holiday Tourist District in Mount Shiwandashan of Guangxi State-owned Farm Group (Guangxi State-owned Changling Farm) | The project includes the construction of the following districts and their supporting facilities: the sanitarium center, public leisure activity area, virgin forest landscape sightseeing area and Buddhism cultural area. | Pingjiang Branch of Changling Farm, Shangsi County, Fangchenggang City | Located in the mid section of Mount Shiwandashan, Jiangping Branch of Changling Farm is about 22 km away from the county seat of Shangsi County with easy road access. Within the project construction area green virgin forest is seen well preserved everywhere . The content of air anion of the forest is 79000 per cubic meters. With an annual mean temperature of 21.2℃, there is neither extreme summer nor extreme winter there. | 1455 | Joint-venture, cooperation or others | internal rate of income: 10.8%. | ①Project proposal; ②Feasibility study; ③Approval for registration | Liqisong Huhang Tel: 86-771-2855261 Fax: 86-771-2615160 E-mail: fzjh@ gxnk.com |
| 218 | H2 | Shengtangshan Tourist Site of Mount Dayao in Jinxiu County (Jinxiu Tourist Bureau) | The planned total area of Shengtangshan Tourist Site is 21.1 sq. km. The project scope mainly includes the construction of the supporting facilities for tourist reception , environment protection,development of tourist sites and scenes and means of transportation within the tourist site. | Jinxiu county, Laibin city | The tourist site of the project is now accessed by a road of sand and stone with ample supply of water and power , ready for further development. It is 53km away from the county seat and the natural environment remains in an original state. The natural resources are well protected. A small number of tourist reception facilities have been established capable of receiving a certain number of tourists. | 1198 | Joint-venture , cooperation or sole-venture | ①Project proposal; ②Feasibility study; ③Approval for registration | Caibaozheng Tel: 86-772-6215238 6216068 | |
| 219 | H3 | Comprehensive Tourism Development of Mount Xishan National Tourist Resorts in Guiping(Guiping General Tourism Development Co.) | The total planned area for development for the project is 13 sq.km. The planned projects for development are: Comprehen-sive Ecological Development of Linghu Lake Landscape, Comprehensive Landscape Development of Huxi Landscape Area, Changxi Landscape Area which includes Agricultural Landscape, Folk House Landscape, Mali Scenic Spot, Mount Jiyi Scenic Spot, Biyun Scenic Spot, construction of Gongqiao Parking lot, Buddha Maitreya on Feilai Cliff, etc. | Tourist Resorts of Xishan Scenic Spot in Guiping city | Mount Xishan in Guiping is one of the first national tourist resorts approved by the state. The tourist facilities in the area have been relatively perfect. The project is located in the north of the Guiping. Such supporting facilities as road access, water and power supply as well as telecommunications facilities are available. | 6025 | Joint-venture or cooperation | annual income: $30.12 million, profit:$10million, invtmt recovery period: 7 years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative design | Dongkeping Tel: 86-775-3381123 13707855628 |
| 220 | H4 | Development and Protection of Ecotourism Resources in Mount Shiwandashan in Shangsi County (Shangsi Tourism Development Company) | Infrastructure Project: new road of 114 km, road rebuilding of 9 km, construction of tourist footpaths of 31.8 km, 5 temporary bridges,1 parking lots,1 storage dams, and 3 docks. Power Supply Project: power transmission line of 9 km, construction of 1 sub-stations. Natural Ecological Projects and Public Service and Management Facilities. | Mount Shiwandashan District of Shangsi County, Fangchenggang City | Road Access: There are in existence hasty road accesses leading to major scenic spots. Communications: fixed-line telephones are available in towns and villages in the main scenic spots. Water and Power: Water and power supply is available in most towns and villages in the landscape area. | 780 | Joint-venture or cooperation | internal rate of income: 11.27%, invtmt recovery period: 9.58years. | ①Project proposal; ②Feasibility study; ③Approval for registration | Henenghui 13086704898 |
| 221 | Religious and Eco-tourism Development of Mount Duqiao in Rongxian County ( Rongxian Tourist Bureau) | Lingjing Temple Subarea is centered by the Lingjing Cliff. The project mainly includes the construction of the Step Hall of Lingjing Temple, the supporting sightseeing facilities and the walk paths within an area of sq. km. The construction scope for the Cloud-covered Peak View Subarea covers the construction of the upward ropeway station, improvement of the footpath system , pavilions and corridors within a total area of sq.km. | Mount Duqiao is only 8 km away from the county seat with convenient road traffic. The scenic spot is already equipped with water supply system, drainage system and power supply system. Mount Duqiao is the 20th facinating place of the 36 famous facinating places of Taoism in China.Mount Duqiao is of typical "Danxia" landform in China, famous for its lofty majesty, unique peaks and strange rocks, quiet valleys and numerous caves, and rich human resources, etc. | 542 | Joint-venture , cooperation or sole-venture | annual income: $2.41 million, internal rate of income: 15.8%, invtmt recovery period: 5.6years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative design | Ganwensheng Tel: 86-775-5322980 | ||
| 222 | H6 | Development of Tourism Resource of Fangchenggang Jiangshan Peninsula and Protection of Its Natural Ecological Environment (Fangchenggang Tourism Development Company ) | The planned area for the scenic spot is 20 sq.km. with a coastline of 32km. Rebuilding 2of Class III highways, constructing 1 of new Class III highways within the scenic spot, one wharf for international passenger transportation, one small passenger wharf, entrance gate of the scenic spot, outdoor bathing place, rescue facilities, canal battery boats, water supply works, north dam of storage reservoir, water treatment plant, etc., 6 parking lots for the Canal Dock and the Moon Bay, etc. Closing the mountains for afforestion, stabilizing the sand for expansion of forest, landscaping, construction of sewage treatment facilities, toilets, and trash cans, etc. Building new 100 KV substations. | Fangchenggang Jiangshan Peninsula Holiday Resorts Area, Fangchenggang city | This scenic spot is connected with Fangchenggang City and Dongxing City on the China-Vietnam border with easy road access. Further effort is necessary to improve the road access, communications facilities, water and power supply facilities. The scenic spot is one provincial-level holiday resort which has a complete tourism management organization. | 118 | Joint-venture or cooperation | annual income: $2.41 million, internal rate of income: 15.8%, invtmt recovery period: 5.6years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④ General design | Moyangchuan Tel: 86-770-2832929 13907709556 |
| 223 | H7 | Daxin Detian Waterfalls Tourist Site (including Mingshi Garden City and Black Water River) (Daxin Detian Tourist Company entrusted by Daxin People's Government) | ①Infrastruction Construction: A. Rehabilitation Highway of 25.5km. B.Tourist footpaths 12.2km. C. New dock 50m. D. Construction of new parking lots 8100 sq.m. E.Construction of water supply facilities to increase the capacity to 2500t/d. F.Laying of sewage treatment device with a treatment capacity of 2250-720t/d. G. Increasing the power capacity to 250-600 KVI. H. Increasing the number of program-controlled telephones to 830. ②Ecological Environmental Protection Project: A. P[rotection and restoration of vegetation of 1366 hetares, B. Improvement of river course 8km. C. Construction of 4020 new biogas generating pits. ③ Tourist Service Supporting Facilities: A. Construction of Tourist Center for 300sq.m. and construction of 5 new sightseeing pavillions. | Southwest Border Area of Daxin County, Chongzuo City | The waterfalls scenic spot is 68km away from the county seat of Daxin County and 200km away from Nanning.Detian Sewage Treatment Plant and Shuolong Sewage Treatment Plant will be completed and put into operation by the end of the year. Special lines for water supply and power supply are available for the scenic spot with normal supply. Detian Waterfalls is located on the border with lofty majesty. Mingshi Garden City has been known as the Small Guilin. The step waterfalls in Shatun, the Black Water River lined with unique peaks and green trees have formed colorful, unique and advantageous tourist resources for development construction of Daxin Detian Waterfalls . | 1159 | Joint-venture , cooperation or sole-venture | internal rate of income: 19.2%, invtmt recovery period: 7.9years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④Tentative design | Zhaomingshan Tel: 86-771-3622409 |
| 224 | H8 | Beihai Weizhou Island Seashore Ecotourism Development (Beihai Tourism Development Co., Ltd.) | The planned area of the project is about 30 sq.km. Infrastructure construction includes the following: sewage treatment, increase of capacity for tap water supply , road connection between the road network in the scenic spots and the traffic artery, power transmission project and garbage disposal system. Ecological protection project includes the following items: work station for coral reef protection zone, ecological engineering construction, environmental improvement and volcano museum . Tourist service facilities: Tourist Service Center and other supporting facilities. | Beihai city | The island belongs to Beihai city which is a nationally well-known tourist city with an airport and accessible by the expressway. The island is 25 sea miles away from Beihai with easy access . Water and power supply facilities and fixed-line telephone and mobile phone communications facilities are available within the island. | 120 | Joint-venture , cooperation or sole-venture | internal rate of income: 12.55%, invtmt recovery period: 9.9years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General design | Huangwenwei Tel: 86-779-3036783 13005990722 |
| 225 | H9 | Development of Tourist Resources of the West Region of Beihai Silver Beach Tourist Zone (Beihai Tourist Company) | Guantouling National Forest Park: total area of 2.98sq.km. Ocean Park:total area of 650mu. Golf Course: total occupancy of 3000mu. Water Paradise:total occupancy of 250 mu. Mountainscape and Waterscape Villas: total occupancy of 100mu.Holiday Hotel: total occupancy of 100mu. Sand Beach Sports Area: land area of 350mu. | West Region of Beihai Silver Beach Tourist Zone | Traffic, communications, water and power supply: Traffic, communications, water and power supply are available. Raw materials and supporting facilities: The project is close to the city zone and the materials necessary for the project construction can be purchased from the city . | 16771 | Joint-venture , cooperation or sole-venture | Investment in Guantouling National Forest Park:USD25300000 with investment recovery period of 8years. Ocean Cultural Park:USD22890000,6years. golf course:USD29397500 ,11years. Water Paradise: USD9400000 ,8years. Mountainscape and Waterscape Villas:USD28560000 ,7years. Holiday Hotel: USD18070000 ,10years. Sand Beach Sports Area: USD24100000 ,6years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General design | Huangwenwei Tel: 86-779-3036783 13005990722 |
| 226 | H10 | Jiuzhou Scenic Spot of Jingxi County, Guangxi(Guangxi Jingxi New Century Tourist Co., Ltd.) | The project is intended for reception of over 100thousand people. The project scope includes Maintenance of cultural relics and historical sites, rehabilitation of folk houses within the scenic spot, pavement of flagging in the scenic spot, construction of sightseeing footpaths,construction of the Embroidered Silk Ball Tower, the National Square, parking lots, wharf, river dredging, construction of roads within the scenic spot, beautification and landscaping, water and power supply, and communications facilities, etc. | Jiuzhou Street, Xinjing Town, Jingxi County, Baise City | Jiuzhou Scenic Spot has geographical advantages. It is 9 km away from the county seat and 30 km away from Longbang Port, 280km away from Hanoi of Vietnam. It has a good traffic network. | 197 | Joint-venture | After completion the project will have a reception capacity of more than 100thousand people, with income only from entrance ticket for 232 thousand USD. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General design | Tanjie Tel: 86-776-6222815 |
| 227 | H11 | Luchuan Jiuzhou Hotspring Holiday Area(Luchuan Tourist Bureau and Luchuan Land Bureau ) | The planned construction area for the area is 15 sq.km. The project scope mainly includes the construction of the following areas: sanitarium area ( including sand therapy , mud bath, medicated bath, incense bath, and wine bath ), sport and exercise area, forest park, religious holy land, drifting adventure area, recreational service area, and reception service area. | Luchuan county, Yulin city | The land conditions for the project are very good. It is close to the county seat of Luchuan County with easy access. Water and power supply as well as communications facilities are guaranteed. Phase I Project of the Project has been completed with the investment 0f RMB40 millionfrom the project owner and is now in operation. | 1900 | Joint-venture | Annual income: $15 million | ①Project proposal; ②Feasibility study; ③Approval for registration ④General design | Yezonghai Tel: 86-775-7226912 |
| 228 | H12 | Wuzhou Baiyunshan -- Longquan Park Tourism Development (Wuzhou Baiyunshan Park) | Construction of Baiyunshan Bingquan Scenic Spot of 4.5 hectares, construction of Yushun Cultural Scenic Spot(including the construction of the temple, tomb, mausoleum, memorial of Emperor Shun and Guguangxin Cultural Street and other scenic spots and sites) of 9hectares, construction of Yuncui Valley Tropical Rain Forest Sightseeing Park (with a total area of 3 hectares), Yunlong Rare Foliage Garden and Longquan Flying Waterfalls Scenic Spot of Mount Baiyun, improvement of mountain footpaths and other facilities such as water and power supply and communications facilities, etc. | Wuzhou city | The scenic spot is located in the city zone of Wuzhou city with complete supporting facilities such as traffic, communications, water and power supply, etc. The meteorological condition ,hydrographic condition, geological landform and forest vegetation landscape condition are favorable with excellent social, economic and political advantages. | 1100 | Joint-venture or cooperation | annual income: $3.93 million, profit: $2.86 million, profit margin: 16.23%, internal rate of income: 13%, invtmt recovery period: 11.6 years. | ①Project proposal; ②Feasibility study; ③Approval for registration | Tangchaohui Maotinggui Tel: 86-774-2355058 |
| 229 | H13 | Cangwu Flying Dragon Lake Eco-tourism Holiday Resort (Cangwu Flying Dragon General Tourism Development Company ) | The reception service area, the sport, leisure and recreational area, the agricultural sightseeing area, the water recreation area, the waterfalls sightseeing area, etc. | Cangwu County, Wuzhou City | Traffic conditions are favorable in the holiday resort area. There are rich water resources with ample supply of water and power and convenient communications facilities. There is huge value for development. It is suitable for such activities as sightseeing, holiday making and other nature-friendly activity, etc. | 876 | Joint-venture , cooperation or sole-venture | annual income: $543 thousand, internal rate of income: 13.4%, invtmt recovery period: 7.8years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General design | Huangyonghua Tel: 86-774-2323177 |
| 230 | H14 | China (Guangxi) TCM Culture Tourism Base (Guangxi Medicinal Garden) | Medicinal plant Area, health preservation and health care area, leisure holiday area, medicinal plant production and processing area and children's popular science recreation area. | Nanning city | the project site is 8 km away from Nanning and its infrastructure construction has been included in the master plan of Nanning and the project ready for development construction. | 1987 | Joint-venture or cooperation | profit margin: 33.5%, internal rate of income: 24.6%, invtmt recovery period: 10.3years (inclusive of 3 construction). | ①Project proposal; ②Feasibility study; | Miaojianhua Tel: 86-771-5614795 |
| 231 | H15 | Tourism Development of Nanning Shanglin Big Dragon Lake Scenic Spot (Shanglin Tourist Bureau) | The total area of the scenic spot is 45sq.km which is planned for the construction of the water recreation center,folk-custom tourist area, agriculture sightseeing area, headstream landscape area and infrastructure construction, etc. The estimated annual number of visitors to the scenic spot will reach 300000 person-times. | Shanglin Big Dragon Lake Scenic Spot, Nanning city | The scenic spot can be accessed from Nanning, the capital city of Guangxi, by either expressway or arterial road with convenient traffic conditions. The Chongqing-Zhanjiang Expressway under construction passes through the county. There are perfect communications facilities and there is one 10kv substation near the project reception service area. | 310 | Joint-venture or others | internal rate of income: 15.21%, invtmt recovery period: 7years (inclusive of 2 construction). | ①Project proposal; ②Feasibility study; | Fanweilin Tel: 86-771-5226796 |
| 232 | H16 | Development of Tianshengqiao Holiday Resort Area (Guangxi Longlin Tourist Bureau ) | Project Scope and Scale : 1 holiday villages, custom parks for 4 ethnic groups such as Miao, Yi, Mulao, and the Zhuang people, etc., 1 luxury boats, and 15 other boats, sightseeing stands, bitumen road of 6.4km., sightseeing path in the Snow Cave scenic spot of 4km , the path within the cave of 4 km, lighting facilities in the cave, stone steps and recreation lawn outside the scenic spot of 200 mu and other supporting facilities. | Longli county, Baise city | Tianshengqiao is located near the old national highway No.324, with easy access road and convenient communications facilities.Tianshengqiao Town is the construction site of Tianshengqiao Hydraulic Power Station . The project has rich water resources and guaranteed power supply . | 350 | Sole-venture | Annual reception of visitors: 200000, total income of turism: RMB604000. | ①Project proposal; ②Feasibility study; ③General plan | Zhaoyuanmin Tel: 86-776-8208948 |
| 233 | H17 | Beiliu Gouloudongtian Tourist Site (Yulin Tourist Bureau/Beiliu Tourist Bureau) | The land area for the project development is 100 hectares for the construction of Goulou Buddhist Temple, Goulou Taoist Temple, scene of Gehong making pills of immortality, sightseeing watercourse connected to Wajiang River, Wajiang Dock on Wajiang River (the Ancient Silk Road of the south ), lotus pond, and battery tourist boats, etc. | Beiliu city, Yulin city | The project is located to the east of Beiliu city zone 3 km away. The national highway No.325 passes by the front of the gate with Wajiang River running by the side. Traffic conditions, communications facilities and water and power supply are guaranteed. There is a good tourist market environment in the place where the project is located. | 300 | Joint-venture , cooperation or sole-venture | Annual income: $2.8 million, invtmt recovery period: 2 years. | ①Project proposal; ②Approval for registration | Majining Tel: 86-775-2832000 |
| 234 | H18 | Development of Tourist Resources and Natural Ecology of Yuanbaoshan--Beijiang Tourist Site in Rongshui County | Rongshui County has both geographical advantages and tourist resource advantages, with good basis for tourism development, preferential policies and good opportunities for development as well. | Rongshui county, Liuzhou city | 816 | Joint-venture , cooperation or sole-venture | internal rate of income: 13.8%, invtmt recovery period: 8.5years (inclusive of 2 construction). | ①Project proposal; ②Feasibility study; ③Approval for registration | Fengshaoming Tel: 86-772-5123613 | |
| 235 | H19 | Reconstruction and Expansion of Longtan Park in Liuzhou (Liuzhou Longtan Park) | The total project area is 5543 hectares. The project scope covers the reconstruction and expansion of the main entrance of the park, environmental improvement of Mirror Lake (Phase II), alteration and construction of small landscapes, alteration of basic facilities , expansion of folk-custom sightseeing area, etc. | Liuzhou city | Perform moderate development of and properly manage the landscape resources so as to reach the goal of sustainable development of the tourist site and permanent utilization of the resources. | 331 | Joint-venture , cooperation or sole-venture | Annual income: $1.2 million, internal rate of income: 15.3%, invtmt recovery period: 4years | ①Project proposal; ②Feasibility study; ③Approval for registration | Weiyougen Tel:86-772-3171720 |
| 236 | H20 | Wuxuan Baiya Great Canyon Scenic Spot (Wuxuan Tourist Bureau) | The project includes the construction of the five scenic spots of Landscape of Lakes and Mountains, Flying Stream Passing the Gully, Lofty Gorge , Peaks Competing for Elegance, and Red Maples Shooting up the Blue Sky , together with related supporting tourist facilities and ecological environment protection project, etc. | Wuxuan county, Laibin city | An investment of $460000 has been made in the early stage of the project. The scenic spot can be accessed directly by a Class III road. Such basic facilities as communica-tions are complete. The scenic spot is capable of receiving visitors and is ready for further development. | 900 | Joint-venture , cooperation or sole-venture | Investment recovery period: 10 years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General plan | Liu Li Tel: 86-772-5212837 |
| 237 | H21 | Xincheng Ruler Mo Culture Tourist Site (Xincheng Tourist Bureau ) | Refurbishing the government office groups of the ancient ruler , repairing the historical street blocks , developing the landscape area of Mount Cuiping and related facilities, constructing commercial pedestrian street, holiday area and visitors' service center. | Xincheng cunty, Laibin city | The project is located in the county seat with complete basic facilities. With a history of years, the government office of Ruler Mo is the only ancient government office group in China that is well protected. It is one of the key State protected monuments and has become a favorite shooting base for TV and films and is also a good place for sightseeing and understanding ancient culture. | 1000 | Joint-venture , cooperation or sole-venture | internal rate of income: 14.48%, invtmt recovery period: 9.8years | ①Project proposal; ②Feasibility study; ③Approval for registration ④General plan | Mochunlin Tel: 86-772-5511557 |
| 238 | H22 | The Baiku (White-trousers) Yao Village Project of Nandan County (Nandan Tourist County ) | The project is mainly for the construction of tourist facilities, leisure facilities,and recreation facilities. | Nandan county, Hechi city | There are complete basic facilities in the project site and construction materials necessary for the project are available in the local market. | 220 | Joint-venture , cooperation or sole-venture | Annual profit: $149 thousand, invtmt recovery period:15years | ①Project proposal; ②Feasibility study; ③Approval for registration | Lianghuiren Tel: 86-778-7232031 |
| 239 | H23 | Tourist Resource Development and Ecological Protection of Qibainong Scenic Spot of Guangxi (Dahua Tourist Bureau) | The project scope covers mainly the construction of Qibainong Tourist Site, Guhezhu Tourist Site, Yantan Tourist Site, and tourist paths, wharf, purchase of facilities for water and power supply and communications, etc. | Dahua county, Hechi city | There are rare karst landforms in the project site with peculiar folk custom, rich hydraulic power resources. It is located in the center of the tourist belt of Nanning-Yiling Cave --Mount Daming---Jinlun Cave--Bama Longevity Village. Therefore there are plenty of tourists. | 830 | Joint-venture , cooperation or sole-venture | internal rate of income: 15.98%, invtmt recovery period: 7.79years | ①Project proposal; ②Feasibility study | Heshengzhou Tel: 86-778-5814379 |
| 240 | H24 | Development of Dajianshi Original Eco-tourism Area in Tian'e County (Tian'e Tourist Bureau) | The total project area is 20 sq.km. It is suitable for such popular tourist activities as mountaineering, forest sightseeing, planting of monument trees, country parties. The project scope includes the construction of such supporting facilities as the road up the mountain for 5 km and the forest footpaths. | Tian`e county, Hechi city | The scenic spot is 5 km away from the county seat with a total area of 20 sq. km., an average sea level of 800m and a forest cover rate of more than 85%. There are within the scenic spot unique landforms, strange stones and rocks, numerous caves and a great many varieties of species. | 183 | Joint-venture , cooperation or sole-venture | Average annual income: $845000 margin of profit+taxes: 38%, invtmt recovery period: 5..88 years. | ①Project proposal; ②Feasibility study; ③Approval for registration | Luoshigao Tel: 86-778-7828066 |
| 241 | H25 | Xing'an Lingqu Historical and Cultural Tourist Site (Xing'an Tourist General Company) | Protection of ancient Lingqu historical human landscape, improvement of Lingqu environment and protection of natural environment, construction of tourist infrastructure in the scenic spot. | Xing`an county, Guilin city | The project is only 57km away from Guilin with complete facilities for traffic, communications, water and power supply. By taking advantages of the tourist resources of Guilin and making full use of its own, the project is worthy of further development. | 946 | Joint-venture , cooperation or sole-venture | Average annual income: $4.86 million, internal rate of income: 16.7%, invtmt recovery period: 7.6 years. | ①Project proposal; ②Feasibility study; ③Approval for registration | Pengpengcheng Tel: 86-773-6222279 |
| 242 | H26 | Dragon Ridge Terraced Fields Landscape Area in Longsheng (Longsheng Dragon Ridge Landscape Area Construction and Development General Company ) | The project includes the construction of the Dragon Ridge Highway, the new entrance area, board and lodging and recreational center for tourists, tourist commodity street, supporting service facilities and environment protection project. | Lngsheng county, Guilin city | The Dragon Ridge Terraced fields is an integration of the pride of shapes of the terraced fields in the countryside and of the wisdom of the mountain people in farming. Layer upon layer, it reaches high up the sky . The scenic spot is one part of the Big Guilin Tourist Area and in the meantime has in itself its own striking features and fame. There is a bright prospect for development. | 500 | Joint-venture , cooperation or sole-venture | Average annual income: $ 3 million, internal rate of income: 11.24%, invtmt recovery period: 6.5 years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative design | Heyijun Tel: 86-773-7517679 13807735172 |
| 243 | H27 | Development of Baoding Lake Tourist and Holiday Resort (Ziyuan Tourist Bureau) | Construction of holiday buildings for 10000 sq.m., hotspring pools for 1000 sq.m., 20 log cabins, 40 "Mongolian Tents" on the water, 6 luxury boats, 20 speed boats. | Ziyuan county, Guilin city | The project is accessed by arterial and secondary roads with ample supply of water and power and well as rich water resources. | 360 | Joint-venture , cooperation or sole-venture | Annual income: $1.59 million, profit : $477 thousand, profit margin : 13.2% | Resources investigation and environmental impact report have been completed. | Zhaozhoude Tel: 86-773-4315718 |
| 244 | H28 | Tourism Development of Chejia Forest Park in Mount Darongshan in Yulin City(Darongshan National Forest Park) | The project occupies an area of 2000 hectares mainly for the construction of Lotus Mountains facilities, Longmen Landscape ,three-star hotel, 20 holiday villas, grass slide field, hippodrome and herbal medicated bath and medicinal meals, etc. | Darongshan National Forest Park in Beiliu City , Yulin city | There are unique forest sights in Mount Darongshan with high-quality tourist resources. Yulin has a good geographical location and good social economic development conditions. It is rich in Guangdong and Guangxi cultures. It has the big environment for tourist development and is attractive to the tourists from Guangdong, Hong Kong and Macao. | 1060 | Joint-venture , cooperation or sole-venture | annual income : $4.22 million, investment recovery period: 5 years. | ①Project proposal; ②Feasibility study; ③Approval for registration ④General plan | Li Rufu Tel: 86-775-6662639 |
| 245 | H29 | Tourism Development of Chengyang Bridge Dong Culture and Folk Custom in Sanjiang County (Sanjiang Chengyang Bridge Scenic Spot Tourism Development Co., Ltd.) | The planned total area of the project is 111.53 sq.km. The project scope includes the perfection construction and protection of Chengyang Scenic Spot, Mapang Drum-tower, Bajiang Scenic Spot, Mengjiang Scenic Spot, Guyi Scenic Spot and supporting facilities. | Sanjiang County, Liuzhou City | The quality of the tourist resources in Sanjiang Chengyang Bridge Dong Culture and Folk Custom Scenic Spot is very high with striking features in its resources and easy road access in the scenic spot. The Chengyang Wind-rain Bridge is a typical representative of the architecture art of the Dong ethnic group and has been on the list for application for inclusion as the world heritage. | 904 | cooperation or sole-venture | Annual income: $3.96 million, average profit after tax: $954 thousand, internal rate of income: 11.74%, invtmt recovery period: 9.38 years | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative design | Tangmengcheng Tel: 86-772-8616567 |
| 246 | H30 | Tourism Development of Xiushui Yao Village of Number One Scholars in Fuchuan County (Fuchuan Tourist Bureau) | The project includes the construction of facilities of water and power supply and ecological environment, the protection and construction of ancient folk houses, ancient buildings, tourist paths, hotels, room and board and other supporting facilities. | Fuchuan county, Hezhou city | The ancient village in the scenic spot is well protected and of large size with rich cultural connotation and beautiful natural environment. The project is equipped with various supporting facilities for construction development. | 600 | Sole-venture | Internal rate of income: 30%, invtmt recovery period: 6 years | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative plan | Zhouhailin Tel: 86-774-7886289 |
| 247 | H31 | Mount Shengtang Scenic Spot in Jinxiu County (Jinxiu Tourist Bureau, laibin City) | The total planned area of the scenic spot is 21.1 sq.km. mainly for the construction of tourist reception facilities, environmental protection, landscape development and construction of traffic facilities in the scenic spot. | Mount Shengtang Scenic Spot in Jinxiu County, Liuzhou City | The project is 53 km away from the county seat with rich tourist resources. It has the honorable titles of the National Nature Reserve and National Forest Park. | 1198 | Joint-venture , cooperation or sole-venture | Internal rate of income:13.61%, net present value: $4.48 million, invtmt recovery period: 9. 68 years | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative plan | Caibaozheng Tel: 86-772-6215238 6216068 |
| 248 | H32 | Xiangzhou Hotspring Tourist and Holiday Resort (Xiangzhou Huachi Hotspring Tourist Co., Ltd.) | The project takes up a total area of 3.6 sq.km mainly for the construction of the entrance area, Huachi Country Villa, Headwaters Landscape Area, hotspring bathing area, sport and gymnasium area, country sightseeing area, and staff residential area. | Xiang zhou county, Laibin city | The project is equipped with other supporting facilities for development. The main sources of tourists are from southwest of China, south China and from Hong Kong, Macao, Taiwan, Japan and Korea. | 1548 | Joint-venture , cooperation or sole-venture | Internal rate of income:12.68%, invtmt recovery period: 6.05years | ①Project proposal; ②Feasibility study; ③Approval for registration ④tentative plan | Jin Yue Tel: 86-772-4362818 |
| 249 | H33 | Development of Tourist Resources and Protection of Ecological Environment of Xiajianhe River in Yizhou (Yizhou Tourist Development Co., Ltd.) | The project includes the road construction of 4km in the scenic spot, 4 footpaths in the scenic spot, 4 parking lots, 5 docks, 2 toilets, expansion of Heliu Village Scenic Spot and purchase of 16 tourist boats. | Yizhou City , Hechi city | Traffic conditions are convenient in the scenic spot. The project is only 6 km away from the Liuzhou -- Yizhou Expressway and there are complete facilities for communications, water and power supply and other facilities. | 1031 | cooperation or sole-venture | Internal rate of income:23.42%, invtmt recovery period: 7.03 years | ①Project proposal; ②Feasibility study; ③Approval for registration | Weiyuhuang Tel: 86-778-3146958 Wulinna Tel: 86-778-2286662 |
| 250 | H34 | Sanniang Bay Aquatic Sport Base in Qinzhou (Qinzhou Sanniang Bay Tourist Co., Ltd.) | The project includes the construction of a wharf with a water front of 100m, a distribution square of 800 sq.m, a chamber with a total construction area of 2000 sq.m. , entrance and exit facilities for aquatic sports and sports device and equipment, construction of take-off and landing platforms for towing parachutes, construction of one platform for take-off and landing of fire balloon , purchase of related device and equipment. | Qinzhou Sanniang Bay Tourist Site, Qinzhou city | The project has advantageous traffic conditions and the arterial road connecting Qinzhou Port, Fangchenggang Port and Beihai Port is under construction. There are complete facilities for communications and rich fresh water resources . Basic facilities are getting improved. | 364 | Joint-venture , cooperation or sole-venture | annual income : $480 thousand, investment recovery period: 10years. | ①Project proposal; &nbs | |